{"version":1,"type":"story","url":"https://digestai.news/story/colt-dcs-and-rmz-begin-64mw-ai-ready-mumbai-3-data-center-construction","json":"https://digestai.news/story/colt-dcs-and-rmz-begin-64mw-ai-ready-mumbai-3-data-center-construction.json","markdown":"https://digestai.news/story/colt-dcs-and-rmz-begin-64mw-ai-ready-mumbai-3-data-center-construction.md","slug":"colt-dcs-and-rmz-begin-64mw-ai-ready-mumbai-3-data-center-construction","headline":"Colt DCS and RMZ begin 64MW AI-ready Mumbai 3 data center construction","summary":"Colt Data Centre Services (Colt DCS) and RMZ, an Indian real assets platform, announced on October 15, 2026, that construction has started on **Mumbai 3**, a 64MW AI-ready data center in Navi Mumbai. The facility is fully pre-let, with its first hyperscale customer already signed, and marks a milestone in the joint venture’s rapid scaling—just 18 months after its 2024 launch.\n\nThe $1.7 billion partnership aims to develop **250MW** of capacity across Mumbai and Chennai. Mumbai 3 will join existing facilities at the Navi Mumbai Campus, boosting its operational capacity from **148MW** to **86MW** upon completion. Designed for high-density AI workloads, the center features hybrid cooling (air and liquid-to-chip), a **220kV GIS substation**, and carrier-neutral connectivity. Both companies emphasize sustainability, with **100% renewable energy** and a closed-loop cooling system to minimize wastewater. The project will create **over 700 jobs** and support local suppliers.\n\nPratap Mane (Colt DCS India) and Deepak Chhabria (RMZ Infrastructure) highlighted the facility’s role in meeting India’s growing AI and cloud demands, citing scalability, resilience, and speed as key advantages.","keyPoints":["Construction begins on Mumbai 3, a 64MW AI-ready data center in Navi Mumbai, fully pre-let with first hyperscale customer signed","Joint venture between Colt DCS and RMZ aims for 250MW capacity across Mumbai and Chennai, backed by $1.7B investment","Facility uses hybrid cooling, 100% renewable energy, and will create over 700 jobs while supporting local suppliers"],"whyItMatters":"India’s AI infrastructure gap is widening as cloud and AI workloads grow. This 64MW center—part of a 250MW expansion—addresses demand for high-density, energy-efficient data centers, critical for hyperscalers and neo-cloud providers scaling in the region.","category":{"slug":"hardware","name":"Hardware & Compute","url":"https://digestai.news/category/hardware"},"entities":{"companies":["Colt Data Centre Services","RMZ","RMZ Infrastructure"],"models":[],"people":["Pratap Mane","Deepak Chhabria","Niclas Sanfridsson"]},"firstPublishedAt":"2026-10-15T05:51:15Z","updatedAt":"2026-10-15T05:51:15Z","sourceCount":1,"hasPrimarySource":false,"sources":[{"outlet":"Unite.AI","title":"Colt DCS, RMZ Start Construction of 64MW AI-Ready Mumbai Data Center","url":"https://unite.ai/colt-dcs-rmz-start-construction-of-64mw-ai-ready-mumbai-data-center","publishedAt":"2026-10-15T05:51:15Z","type":"press","primary":false,"lead":true}],"sourceNotes":null,"discussions":[],"thread":null,"cite":{"text":"Digest AI, \"Colt DCS and RMZ begin 64MW AI-ready Mumbai 3 data center construction\", 15 October 2026, https://digestai.news/story/colt-dcs-and-rmz-begin-64mw-ai-ready-mumbai-3-data-center-construction","publisher":"Digest AI","title":"Colt DCS and RMZ begin 64MW AI-ready Mumbai 3 data center construction","datePublished":"2026-10-15T05:51:15Z","url":"https://digestai.news/story/colt-dcs-and-rmz-begin-64mw-ai-ready-mumbai-3-data-center-construction"},"generatedBy":"Written by Digest AI's editorial model from the linked sources; the sources are the record.","license":"Headlines, digests and key points are written by Digest AI and may be quoted with a link to the story page. Linked articles belong to their publishers. Terms: https://digestai.news/terms#reuse"}