{"version":1,"type":"story","url":"https://digestai.news/story/envision-builds-800mw-galaxy-ai-campus-with-wind-farms-and-battery-sto","json":"https://digestai.news/story/envision-builds-800mw-galaxy-ai-campus-with-wind-farms-and-battery-sto.json","markdown":"https://digestai.news/story/envision-builds-800mw-galaxy-ai-campus-with-wind-farms-and-battery-sto.md","slug":"envision-builds-800mw-galaxy-ai-campus-with-wind-farms-and-battery-sto","headline":"Envision builds 800MW Galaxy AI campus with wind farms and battery storage","summary":"Envision is constructing a 800MW AI data center campus in Inner Mongolia’s Ulanqab region, according to a report by *SemiAnalysis*. The Galaxy AI campus, developed in four phases for two unnamed internet companies, aims to match the 820MW capacity of the US Stargate project in Texas. Envision completed the first 120MW phase in under a year, citing costs one-fifth lower than comparable US projects. The facility integrates its own wind farms and battery storage to secure power, with over 100GW of turbines planned to cover 60% of the first two phases’ electricity needs. Two wind farms, each about 80 kilometers apart, collectively provide 420MW—exceeding the expected 240MW load for the initial phases. Battery storage ensures continuous power when wind output fluctuates.\n\nThe campus also employs solid-state transformers to convert 10kV AC electricity directly to 800V DC for server racks, reducing intermediate conversion stages. A 5MW pilot hall demonstrates this approach, aligning with Nvidia’s push for 800V DC in high-density AI systems. Cooling is managed via a shared water loop for both liquid-cooled and air-cooled servers, eliminating traditional central chiller plants. Envision’s broader Inner Mongolia plans include up to 3GW of capacity, with nearly 30,000 construction workers across 22 projects in the Chahar High-tech Zone. Companies like Alibaba, Huawei, and ByteDance are expanding infrastructure in the region, driven by cheap electricity, land availability, and wind resources. However, China’s access to advanced AI accelerators remains constrained by US export restrictions on chips like Nvidia’s.","keyPoints":["Envision’s Galaxy AI campus in Inner Mongolia will reach 800MW capacity by late 2027, matching US Stargate’s 820MW","First 120MW phase completed in under a year at costs one-fifth of comparable US projects, per *SemiAnalysis*","Wind farms and battery storage supply 60% of power for initial phases, with two 420MW farms covering 240MW load"],"whyItMatters":"The project demonstrates China’s ability to build large-scale, cost-efficient AI infrastructure independently, bypassing US chip restrictions through local innovation in power and cooling. It could redefine global AI data center economics and accelerate China’s tech leadership.","category":{"slug":"hardware","name":"Hardware & Compute","url":"https://digestai.news/category/hardware"},"entities":{"companies":["Envision","Nvidia","Alibaba","Huawei","ByteDance"],"models":[],"people":[]},"firstPublishedAt":"2026-11-09T13:00:00Z","updatedAt":"2026-11-09T13:00:00Z","sourceCount":1,"hasPrimarySource":false,"sources":[{"outlet":"Tom's Hardware","title":"China builds massive 800-megawatt AI data center campus to rival US Stargate project","url":"https://tomshardware.com/tech-industry/data-centers/china-builds-massive-800-megawatt-ai-data-center-campus-to-rival-us-stargate-project-galaxy-campus-delivers-first-120-megawatts-in-a-year-at-one-fifth-the-cost","publishedAt":"2026-11-09T13:00:00Z","type":"press","primary":false,"lead":true}],"sourceNotes":null,"discussions":[],"thread":{"title":"Envision Powers AI Campus Expansion","url":"https://digestai.news/thread/envision-powers-live-ai-workloads-with-800v-dc-system-at-ulanqab-campus","storyCount":2},"cite":{"text":"Digest AI, \"Envision builds 800MW Galaxy AI campus with wind farms and battery storage\", 9 November 2026, https://digestai.news/story/envision-builds-800mw-galaxy-ai-campus-with-wind-farms-and-battery-sto","publisher":"Digest AI","title":"Envision builds 800MW Galaxy AI campus with wind farms and battery storage","datePublished":"2026-11-09T13:00:00Z","url":"https://digestai.news/story/envision-builds-800mw-galaxy-ai-campus-with-wind-farms-and-battery-sto"},"generatedBy":"Written by Digest AI's editorial model from the linked sources; the sources are the record.","license":"Headlines, digests and key points are written by Digest AI and may be quoted with a link to the story page. Linked articles belong to their publishers. Terms: https://digestai.news/terms#reuse"}